Design and installation of an elevated pressure gas meter rig to support the expansion of the University of Keele campus.

Programme

Over recent years, the University of Keele has embarked on a far-reaching expansion programme for its campus and business facilities. With this growth came the need for an upgrading of the gas network that would not only meet current requirements but also take account of the university’s plans for the future.

We were called in to disconnect and remove an existing 11M medium pressure gas meter, and supply and install a new 16M medium pressure twin-stream rotary meter and associated pipework capable of managing a load of 4,003kWh at an elevated pressure of 28mbar.

The work had the potential to cause significant disruption but through careful planning, comprehensive communication and close co-operation with the university, we were able to complete the work rapidly and on time, utilising the existing inlet and outlet headers and locating the rig within the current housing.

Outcome

The university acknowledged the extent to which our planning and installation programming kept disruption to a minimum.


A proven track record

An 11m medium pressure gas meter disconnected and removed.

Supply and install a new 16m medium twin stream rotary meter and associated pipework.

Pipework for a load of 4003kWh at 23mbar.


National Gas Emergency ServiceElectricity fault?

We’re fully accredited in multi-utility metering and multi-utility infrastructure construction and adoption.